Cnc milling machine is usually within 15 days, vertical cnc machining center is within 25 days, gantry type machining center is within 45 days, if you need to add special configuration, the delivery time will be postponed.
Lathe which is smaller than CK6150(including CK6150) is usually within 15 days, lathe which is larger than CK6163(including CK6136) needs 30 days, SCK series lathe needs 30 days. As for large lathe, we need further confirmation for the production cycle.